PLAN
Proposed Project
Scope
The project is designed to
address the immediate
needs of the central
commerical district and
nearby homes. It would
consist of the algaewheel
treatment facility, pump
tanks, piping, and electrical
work as needed for the
project.
Future
The project contruction includes building the
algaewheel treatment facilty with extra capacity to
allow for additional homes to be added if needed.
Piping has been designed to accomodated future
expansion if needed. Conceptual plans have been
developed for Phase II and Phase III construction
to address additional areas if needed.
Cost
Ongoing costs will depend on the number of
homes and businesses connected to the system.
Preliminary costs target a monthly operating cost
of $30-40 per unit.
In addition to monthly operating costs, there will
also be a monthly cost to recover the initial
investment cost of the infrastrutture. We are
hopeful that through a combination of Federal,
State, and Local funding options coupled with
private grants as needed, we can hold the monthly
costs to an affordable level for all homes and small
businesses connected to the system.
© Lorem ipsum dolor sit Nulla in mollit pariatur in, est ut dolor
eu eiusmod lorem 2013
SIMPLICITY
Ae
Ut.
Excepteur dolor esse, et sit, velit quis ex lorem in a
non.
Ea eiusmod dolor sit non voluptat
Al.
Dor.